Application For New Service
Planning
Starting Project
Permits Needed
Installing Service
Potential Fees
Safe Clearances
Site Preparation
Transferring Responsibility
References
Business Services
Rates
Saving Energy
Safety
Starting Your Project

Information needed
MGE needs this information to process your service request most efficiently:

  • Address of the new building site.
  • Name, address and telephone number of person responsible for billing.
  • Name and telephone number of contact person (architect, engineer, general contractor and/or electrical contractor).
  • Date the building site will be ready for service.
  • Date service is required.
  • Building plans, especially site plans.
  • A copy of septic and water system prints are required unless the area is served by municipal sewer and water.
  • Future plans for additions, site improvements, etc.

Electric service and meter requirements

  • Main service disconnect ampere rating, voltage, number of phases and location on building.
  • Number of electric meter(s) and the individual connected load(s), voltage(s) and number of phases each meter requires.

Gas service and meter requirements

  • The gas service pressure needed at the outlet of the meter(s)—1/4 PSIG is standard.
  • Number of gas meter(s) and the individual connected load(s).

Multifamily and commercial/industrial projects only
While not required for all projects, the following information is important for most projects to enable MGE to design and install the best service for you.

  • Site plan, full size to scale, showing locations of:
    • Natural gas and electric service routes.
    • Regulators and relief valves (on outside of the building).
    • Gas and electric meters in close proximity (but not within 3 feet) and preferably outside the building.
  • Natural gas service sizes:
    • BTU
    • CFH
    • PSI
  • Electric service sizes:
    • Amperes
    • Voltage
    • Single or three phase
  • Transformer locations:
    • Within 100 feet (preferably less) of the service entrance location
    • Within 15 feet of a paved surface for truck access
    • Meets all applicable building clearance requirements
  • Survey (if available)
  • Grading plan
  • Storm/water/sanitary sewer plan
  • Landscaping plan
  • Floor plans
  • Building elevations
  • Electrical and mechanical plans