Potential Installation Fees
Electric
We will:
- Review your building plans.
- Inspect the installation site.
- Prepare an estimate.
If an installation charge is necessary, we will need a deposit before work can begin.
Service |
Fee |
| Temporary electric service supplied during construction |
A minimum charge of $72 plus energy use.* |
| Permanent electric underground service lateral or overhead service drop |
No charge for standard installation.* |
| * Customers may be responsible for the nonstandard installation costs and for costs to extend electric distribution facilities to the lot or to modify them. Call for more information. |
Natural gas
We will:
- Inspect the installation site.
- Prepare an estimate.
Gas main (supply pipe in the street)
For a house or business located close to an existing gas main, there may be no installation charge.
If a main extension is necessary, a deposit may be required before work can begin.
Gas lateral (from the main to your building)
Service |
Fee |
| From the main to your property line |
No charge. |
| From your property line to your closest building wall |
No charge to first wall or 65 feet, whichever is least. Beyond that, additional charges apply. |
Additional trenching charges
Winter
During the winter months (Dec. 1–April 1), there is an additional charge for trenching. To avoid this $225 charge per requested service and $2.75-per-foot distribution trench, apply before Nov. 1 and have your site ready for trenching and installation by Dec. 1.
Solid rock
Digging through solid rock is difficult and costly. If you anticipate rock digging, call us early so we can explore other options. Customers will be charged the full cost of solid-rock trenching, rock removal and backfilling. Typical cost is $25 per foot.
|